Already have planning?

Have planning permission? Now make sure you choose the right contractor.

You may already have planning permission, drawings and a quotation for your padel project. Before you appoint anyone, it is worth making sure the scope, specification, groundworks, installation, responsibilities and exclusions are properly understood.

Build & Padel can review the project information you already have and provide a clear delivery proposal.

Completed padel court built by a UK construction team

20+ years

UK construction & groundworks experience

Construction-led

Not simply a court reseller

Manufacturer-agnostic

We specify around the project

One accountable team

Groundworks, courts and delivery

UK-based

In-house delivery team

You have planning. What happens next?

Planning permission is only one part of the project.

Getting planning through is a real milestone. It does not, on its own, answer the construction and procurement questions that decide what the project costs, how long it takes and who carries the risk.

What you may already have

  • Planning permission
  • Site plans
  • Architect drawings
  • Court layouts
  • Planning conditions
  • Drainage information
  • Existing specifications
  • Court manufacturer information
  • One or more quotations

What still needs to be understood

  • Groundworks scope
  • Drainage requirements
  • Concrete / base specification
  • Court specification
  • Court installation
  • Electrical requirements
  • Lighting
  • Access and logistics
  • Site preparation
  • Programme
  • Temporary works where required
  • Testing and commissioning
  • Warranty responsibilities
  • Defects and aftercare
  • Contractor responsibilities
  • Exclusions, provisional sums and variations

A quotation is only useful if you understand what sits behind the number.

Why one quotation isn't enough

One quotation gives you a price. It doesn't necessarily give you confidence.

Most buyers arrive at procurement with a single quotation. With one number and one scope in front of you, it is difficult to establish whether:

  • The scope is complete
  • The specification is appropriate
  • Groundworks are correctly allowed for
  • Drainage has been considered
  • Electrical infrastructure is included
  • Installation responsibilities are clear
  • There are significant exclusions
  • Provisional sums could increase the final cost
  • The programme is realistic
  • Warranty responsibilities are clear

The issue is rarely that a quotation is “wrong”. More often, different contractors have simply priced different scopes.

The real question is: are you comparing like-for-like?

What to compare

Compare the scope, not just the headline price.

01

Groundworks

  • Excavation
  • Sub-base
  • Concrete / slab
  • Reinforcement
  • Drainage
  • Levels
  • Disposal of spoil
  • Access requirements

02

Court specification

  • Court manufacturer
  • Court model
  • Steelwork
  • Glass
  • Turf
  • Net
  • Anchoring
  • Protective finishes

03

Lighting & electrical

  • Lighting specification
  • Number and position of fittings
  • Electrical supply
  • Cabling
  • Distribution equipment
  • Controls
  • Testing

04

Installation

  • Delivery
  • Offloading
  • Assembly
  • Glass installation
  • Turf installation
  • Lighting installation
  • Final testing

05

Site infrastructure

  • Access
  • Pedestrian routes
  • Fencing
  • Drainage
  • External works
  • Landscaping
  • Waste removal
  • Security

06

Programme & responsibility

  • Start date
  • Construction duration
  • Dependencies
  • Who manages subcontractors
  • Who coordinates suppliers
  • Who is responsible for defects

07

Warranty & aftercare

  • Court warranty
  • Installation warranty
  • Groundworks responsibility
  • Glass / turf replacement
  • Maintenance
  • Defects period
  • Aftercare arrangements

The hidden difference between two quotes

Two padel quotations can look similar and deliver very different projects.

Illustrative example — not a comparison of actual competitors.

ItemQuote AQuote B
Court supplyIncludedIncluded
InstallationIncludedIncluded
GroundworksIncludedProvisional
DrainageExcludedIncluded
Electrical supplyExcludedIncluded
Concrete specificationUnclearDefined
Site preparationLimitedIncluded
Project managementUnclearIncluded
Warranty responsibilitiesSplitDefined
AftercareNot statedIncluded

The cheaper quotation is not necessarily cheaper once exclusions, provisional sums and additional contractors are taken into account.

What Build & Padel actually does

We don't just price the court. We look at the project.

Construction-led

We approach the project as a construction project, not simply a court purchase.

Manufacturer-agnostic

The court specification should suit the site and the project, not a single manufacturer's range.

Groundworks-aware

Base, drainage, levels and ground conditions are fundamental to the finished court.

Single point of accountability

Where appropriate we coordinate delivery, rather than leaving you to manage disconnected suppliers.

Built for the UK

The specification has to account for UK weather, drainage, ground conditions and site constraints.

Groundworks and base preparation for a padel court

What we can review

Send us what you already have.

You do not need to start the process again. Send whatever project information exists today — even if it is incomplete — and we will tell you what else we need.

Planning drawingsSite plansArchitect drawingsCourt layoutsSpecificationsContractor quotationsSupplier quotationsCost plansSurveysSite photographs

Depending on the project, the delivery proposal may cover…

Scope of works

What is actually being delivered, and by whom.

Groundworks & base

Excavation, drainage, sub-base and slab specification.

Programme

Sequence, duration and dependencies on site.

Risk areas

Key items that could affect cost, programme or delivery.

Court supply & install

Manufacturer, model and installation responsibility.

Electrical & lighting

Supply, cabling, fittings, controls and testing.

Warranty & aftercare

How responsibility continues after installation.

Exclusions

What is not included, stated plainly.

Indoor padel court structure under construction

Why construction experience matters

A padel court is a construction project before it is a sports product.

A court can be manufactured perfectly and still perform poorly if the construction underneath it has not been properly considered. The finished project depends on ground conditions, levels, drainage, the concrete base, access, electrical infrastructure, installation, site management and maintenance.

The court is what the customer sees. The construction underneath it is what the customer lives with.

Questions to ask any padel court builder

Before you appoint a padel court builder, ask these questions.

  1. 01Who is responsible for the groundworks?
  2. 02What exactly is included in the base specification?
  3. 03Is drainage included?
  4. 04Who supplies and installs the court?
  5. 05Which manufacturer and model are being proposed?
  6. 06Is the contractor manufacturer-agnostic?
  7. 07Who manages the project?
  8. 08Who is responsible if different suppliers disagree?
  9. 09What is excluded from the quotation?
  10. 10Are there provisional sums?
  11. 11What assumptions have been made about the site?
  12. 12What is the expected programme?
  13. 13What warranties are included?
  14. 14Who handles defects?
  15. 15What happens after handover?
  16. 16Is maintenance available?
  17. 17What could cause the final price to change?

Differentiators

Why buyers use Build & Padel for delivery

Builders first

Over 20 years of UK construction, groundworks and site delivery experience.

Manufacturer-agnostic

We are not tied to one court manufacturer.

One accountable team

Where the scope allows, one delivery partner coordinates the project.

Practical advice

If something in the existing scope does not make sense, we will explain why.

Primary next step

Already have planning? Let's look at what you've got.

Send us your drawings, specification, existing quotation or other project information. We'll review what's available and, where the project is suitable for us to deliver, provide a clear proposal for the work.

What can I send?

Planning drawings · Site plans · Specifications · Quotations · Court layouts · Cost plans · Surveys

If you don't yet have planning or a sufficiently developed project, our Site Feasibility & Planning service is the better starting point.

Contact details
Project
What do you already have?
Upload

Drawings, specifications, quotations, cost plans, surveys, photos — PDF or image.

Your information is used to assess your project and respond to your enquiry. We do not need a perfect brief — send what you already have.

Secondary resource

Want to compare quotations yourself first?

Our guide covers scope, groundworks, court specification, installation, electrical, drainage, exclusions, warranties, programme and risk.

Read: How to Compare Padel Court Quotations

FAQs

Padel court procurement, answered.

Do I need planning permission before getting a padel court quotation?+

Planning and procurement often overlap. What matters is that a contractor has enough project information — layouts, levels, drainage, access and specification — to price the delivery scope rather than a generic court package.

Can Build & Padel quote from an existing planning application?+

Yes, where the drawings and supporting information are sufficient. The completeness and quality of that information directly affects how meaningful a proposal we can put together.

Should I get more than one padel court quotation?+

Competitive quotations help you establish whether pricing and scope look reasonable. But comparing price alone can mislead — two contractors will often have priced two different scopes.

What should a padel court quotation include?+

Court supply, groundworks, drainage, installation, electrical infrastructure, site works, project management, warranties, aftercare and a clear statement of exclusions and provisional sums.

Why can padel court quotations vary so much?+

Differences in scope, ground conditions, base specification, manufacturer, electrical works, drainage, site access and exclusions all move the number, sometimes substantially.

Does Build & Padel supply and install padel courts?+

Yes. We do it construction-led and manufacturer-agnostic — specifying the court that suits the site, then building the base and infrastructure to carry it.

Does Build & Padel do the groundworks?+

Yes. Construction and groundworks form part of appropriate project scopes, which is where two decades of UK site experience sits.

Can you review another contractor's quotation?+

We can review the information you provide as part of assessing a potential delivery project. It is not a formal professional audit of another contractor's work — the purpose is to understand the project and develop an appropriate delivery proposal.

Are you tied to a particular padel court manufacturer?+

No. We specify manufacturers we trust based on the site, the players and the budget rather than a single-brand relationship.

What happens after I submit my project?+

Initial review, clarification of anything missing, a discussion of your requirements, definition of the delivery scope, a proposal where the project is suitable, and agreement of next steps.

Once your courts are being delivered, Padel Engine can also help operators manage the commercial and operational side of the venue.